Professional washing cabinet manufacturers

News classification

Contact us

Shanghai Le Yi bathroom Technology Co., Ltd.

Tel: 021-56473751

Fax:021-56475286

Web: www.shxysj.com

Service Hotline: 400 -6678-776

E-mai:2880583959@qq.com

Add: No. 111 Lu Xiang Road, Baoshan District, Shanghai


How to install the washing machine

How to install the washing machine

Date of release:2018-01-04 Author: Click:

Listen to the washing cabinet manufacturers that the installation of balcony cabinets and laundry precautions

First, the product set and in-kind match (control product)

Second, open the box, look at whether there is a problem, whether the lack of accessories.

Third, clean the installation location before installation, keep the site clean, ready to install.

Fourth, the installation of the cabinet body will be adjusted before the feet twist, firm, and then put the product is installed, on the installation location, first adjust the feet leveling, so that four adjustable feet simultaneously force, and then adjust the size of the door , The handle position transferred to the front, and some products require on-site openings, pay attention to the water inlet position and the water outlet, as well as washing machine power supply position.

custom washing cabinets

Five, the tabletop package opened, remove the table and the accessories inside the first, and then overflow the overflow well and overflow casing, then the faucet installed in the basin above, screw on the inlet pipe two, fixed, and then the table on the The assembled cabinet above adjust the level, the inlet pipe connected to the inlet, (Note: the gasket must not be dropped or missing equipment, tighten the next head open, the contact surface coated with silicone, Lock, and then a set of sewer pipe well, the water and sewer pipe connection to complete the test water surface and wall contact part of the lay silicone, to prevent water from entering.

Sixth, the final clean up inside the cabinet to install debris, improve hygiene and guidance to customers, do not use sharp objects in the basin and the panel friction to prevent scratches, resulting in poor product.

Seven, after the completion of the pool filled, check whether there is leakage of water (including water, water, overflow hole, cage and sewer), said no leakage if it is completed, if there is leakage of water to be reprocessed or coated with silica gel , Until no leakage so far. Shanghai washing closet

Eight, our request is your pursuit, let us work together to do every job!


The address of this article:http://www.shxysj.com/en/news/384.html

Related labels:customwashingcabinets

The last one:Optional balcony laundry
The next one:None

Contact us

Shanghai Le Yi bathroom Technology Co., Ltd.

Tel:021-56473751 / 13472664567   We:www.shxysj.com   E-mail:2880583959@qq.com

Add:No. 111 Lu Xiang Road, Baoshan District, Shanghai